07/23/2026
Construction continues to make steady progress throughout the building as multiple trades work simultaneously on interior finishes and building systems. Over the past several weeks, crews have completed window installation, drywall finishing on the fourth floor, wall texture and painting, trim and door installation on the fifth floor, and cabinet installation is well underway. Drywall installation and finishing continue on the lower floors, while plumbing, electrical, HVAC, and fire suppression systems continue advancing throughout the building. Permanent power preparations are progressing, and rooftop HVAC equipment, furnace units, and associated mechanical systems have all moved forward significantly.
On the exterior, masonry restoration and tuckpointing continue to preserve the building's historic character while structural improvements move ahead inside. In the coming weeks, crews will continue painting, cabinetry, drywall finishing, wall texturing, plumbing and electrical rough-ins, structural infill work at the elevator pit, and the transition toward permanent power and temporary air conditioning as the project steadily advances toward its next major milestones.
Owner/Developer: Overland Property Group & Flint Hills Holdings Group
Funding and Allocation Agency: Kansas Housing Resources Corporation
Pre-Development, Construction and Perm Loan: Bennington State Bank
LITHC and other Investors: Redstone and Sugar Creek Capital
General Contractor: Overland Construction Group
Architect: Jones Gillam Renz Architects
Interior Designers: Collective Design Studio
Leasing and Property Management: Omega Management Group