09/21/2026
That's one module of a home. On a trailer.
The Ranch left our Grand Junction factory this morning - one of four modules, headed up valley.
One thing worth being precise about, because it's the question we get most: this is an IRC home, not a HUD home. It's built to the same International Residential Code as any site-built home, it sits on a permanent foundation, and it gets assembled on site. The trailer is transport. Nothing more.
This week the foundation gets poured. Once it cures, we set the modules and put the home together.
Read that order again - the home was being built while the foundation was still being formed.
On a site build those two things happen back to back. Frame waits on foundation. One trade waits on the last one. Every week of weather and every hole in the labor schedule lands directly on your timeline. In a market this tight on workforce, that's where the months go.
Building indoors lets us run both critical paths at the same time. The factory doesn't care what the weather is doing in November, and nobody stands around waiting on concrete to cure.
Our target: permit in hand to certificate of occupancy in 45 days.
That's the real case for modular. Not that it's cheaper per square foot - that it collapses the calendar. And the calendar is what costs you money.
Swipe to see what it becomes.
See The Ranch: https://na2.hubs.ly/H07XWQB0
Buy a home, or homes: https://na2.hubs.ly/H07XWQZ0
Partner with us or invest in the factory: http://fortandhome.com