28/10/2026
How Long Does a Bathroom Renovation Take?
Stage by Stage
Planning a bathroom renovation? Understanding each stage helps you know what to expect and plan ahead.
A typical bathroom renovation takes 2–4 weeks, depending on the size, design and material selections.
Typical Renovation Timeline: 2–4 Weeks
1. Consultation & Planning | 1–2 Days
Discuss your ideas, measure the space and prepare your quote.
2. Demolition | 1–2 Days
Remove existing tiles, fixtures and finishes to prepare the space.
3. Plumbing & Electrical | 2–3 Days
Prepare plumbing, wiring, lighting and exhaust fan connections.
4. Waterproofing | 1–2 Days
Apply waterproofing to the required wet areas in accordance with Australian Standards.
5. Tiling | 3–7 Days
Install wall and floor tiles, allowing time for setting and grouting.
6. Fixtures & Fit-Off | 2–4 Days
Install the vanity, toilet, tapware, shower screen and accessories.
7. Final Inspection & Clean | 1 Day
Check the finished work and clean the space before handover.
What Can Affect the Timeline?
Bathroom size and design complexity.
Material and fixture availability.
Trade scheduling.
Unexpected issues discovered during demolition.
Planning a bathroom renovation? Contact us for a free consultation and expert advice.
📞 0493105409
゚viralシfypシ゚