10/29/2026
New job just kicked off in Lincroft the only way it should — with the layout marked and the footings started.
We’re building a covered overhang off the back of the house. 20 feet structure width, 12 feet of projection, shed roof sloping away from the house, charcoal/black standing seam metal, white AZEK fascia and soffit, tongue-and-groove AZEK ceiling, two columns (no center column), and two fans. The kind of space that actually gets used instead of just looking nice in a photo.
Today was the unglamorous part: layout and digging. The rendering is sharp. The holes are just holes. We’ll take the second half of that any day.