11/01/2026
What does it take to prepare a church for a 4,000-lb organ? ⛪️🔨
At St. Jude’s Church in Pharr, Texas, Zondo Construction is going behind the walls and beneath the surface to prepare this historic space for its next chapter.
This phase of the project focuses on demolition, structural preparation, and reinforcing the second-tier floor to support a future 4,000-lb organ and choir seating.
Every wall opened, and every section exposed, brings us one step closer to creating a stronger, safer space designed for the church’s future. With its high ceilings and natural reverb, the sanctuary will also continue to provide the warmth and depth that make choral music so powerful.
This is just the beginning of the transformation.
📍 Pharr, Texas
📞 956-562-9770
🌐 zondoconstruction.com
Follow along as we take you behind the build and share each phase of this special project.