10/27/2026
8 days. Two levels brought down.
Nearly 60,000 square feet per floor—watch this pick module come down as G&P advances the decommissioning of the former Macy’s distribution center in Tulsa/Owasso.
Across the 1.2-million-square-foot facility, major milestones are adding up:
▪ Large pick module and shoe-module structures down.
▪ Two Beumer sorters and the conveyor lines beneath the structural mezzanine removed.
▪ Crews progressing into shipping-area demolition, opening more floor space and dock access.
Behind every cleared area is a coordinated effort: dismantling equipment, recovering materials, and reworking building systems to prepare the facility for its next use.
Have a facility exit or consolidation ahead? Message G&P to discuss your equipment, timeline, and asset recovery options.