04/27/2021
Weekly FaceTime meetings are extremely necessary! I’m talking 3 or 4 times a week.
•
As most of you know I also travel for a living. Majority of the time I’m not in Chicago for the day to day operations of my rehab. In the past, I would stress myself out trying to work my schedule in a way where I could be in town everyday to pop up on my contractors & make sure they were actually working. This time around I decided I didn’t have the energy to babysit. I let go of the reigns and I’m trusting God 100% for this to go the way we planned.
(Now granted, I may have my brother or dad go pop up occasionally because any smart business woman would but that’s besides the point stay focused 😂)
•
This week we are halfway through all plumbing and electrical work! We’ve also completed the extra work required by my architect to provide the necessary support in the ceilings (if you’ve been keeping up with my YouTube videos you know what I’m referring to. If you don’t click the link in my bio! ^_^)
•
Once plumbing and electrical are done, I’ll have to have an inspector approve everything than it’s smooth sailing from there. Getting the foundational work complete is the most difficult part of a rehab & always takes the longest in my experience. Everything else after that is cosmetic and that’s easy breezy. Dry wall, painting, cabinets, flooring, etc.. that’s always been my favorite part!! That’s where the character and charm happens. Can’t wait!
•
Oh did I mention I hired a team to come out and tear my garage down! The entire back yard looks so different and I’m actually not a fan of it but it was necessary at this moment. Stay tuned I’ll be posting updates and pictures to my story this weekend!
•