30/09/2026
𝗣𝗿𝗼𝗷𝗲𝗰𝘁 𝘂𝗽𝗱𝗮𝘁𝗲: 𝗦𝘁𝗮𝗴𝗲 𝟭 𝗰𝗶𝘃𝗶𝗹 𝘄𝗼𝗿𝗸𝘀 𝗻𝗲𝗮𝗿𝗶𝗻𝗴 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗶𝗼𝗻
It’s great to see He Wāhi Rangimārie in Massey taking shape, with Stage 1 civil works expected to wrap up over the next couple of months.
The Caughey Preston Trust is developing He Wāhi Rangimārie, a place of peace, as a supportive housing community for wāhine whai ora (women seeking wellbeing). The completed development will provide 56 homes across a 4.2 ha site, with approximately 2 ha of native bush protected by covenant.
Guided by mana whenua and a design panel of women with lived experience, the papakāinga-based masterplan brings together tikanga Māori and trauma-informed design. Communal whare, gardens, a pā harakeke and māra hūpara play areas will sit alongside the homes, creating spaces for connection and wellbeing.
Cato Bolam has been involved from resource consent through civil design and is serving as Engineer to the Contract for the civil works.
Civil works for the first 24 homes are progressing well, including earthworks, retaining walls, a wastewater diversion, stormwater tanks and treatment systems, water supply and service trenches, all being delivered by March Cato Developments. House construction is the next step.
Cato Bolam is proud to contribute our expertise to help create a community that will become a place of healing for wāhine.
Thank you to the Caughey Preston Trust, March Cato Developments, PJM Project Management, Studio Tira, Resilio and our Cato Bolam team for the collaboration behind this milestone.