03/11/2026
From the drawing board to the roof line 📐➡️🏗️
The steel frame is in on our latest project, with nearly 2 tonnes of steelwork now forming the new roof structure.
It’s always satisfying seeing the fabrication drawings come to life on site, with every beam, bolt and angle exactly where it should be.
Big thanks to for the fabrication 👊
Next up: the roof 🔨