08/11/2026
Finally finished this cottage off near Sidmouth.
This has been an epic job.
The oak walls had rotted out at floor level downstairs, upstairs was slowly sagging in to downstairs...all fixed now!
Inulated limecrete floors throughout ground floor.
Ceilings repaired and all walls rendered and plastered.