Two steel beams installed, three new lintels and over 150 tonnes of waste oot the door🚪💪
Some shift, this one. 💪🫡
We got stuck into a big house extension, digging out and levelling the back garden so it’s ready for whatever comes next.
Inside, we put the temporary supports in place, installed two load-bearing steel beams running the full length of the house and fitted three new lintels for the new layout.
All in, we shifted over 50 tonnes of brick, mortar, soil and construction waste. An absolute pleasure to be part of this one. We got our hands dirty, learned plenty along the way and we’re proud of the part weve played sp far. 🤝
Our 2027 diary is open for projects big and small. Got groundwork, a strip-out or a site clearance coming up?
Send us a few photos, your postcode and a wee bit about the job, and we’ll have a chat.