11/11/2026
Your slab inspection might be too late to see the footings.
If the builder pours footings separately, the ground beneath them could already be covered by the time the slab is ready. That is why the construction sequence matters as much as the inspection date.
Before the next pour, confirm:
• Which footings or piers are included in the visit?
• Will the supporting ground still be visible when it needs checking?
• Are current engineering drawings and soil information available?
• How will concerns be addressed before the work is concealed?
An independent review can help you understand accessible work and recorded findings. It sits alongside the project's required certifier and engineering arrangements.
Our guide explains what to check, what to ask and how to organise follow-up without trying to inspect an excavation yourself.
Read the guide: https://tdcorp.au/footing-inspection-checklist/
TD Building & Inspections Pty Ltd
📞 0416 661 771 | 0468 999 926 | 0475 096 132
✉️ [email protected]
📍 3 Nugent street, Durack, Qld 4077