24/10/2026
𝐖𝐲𝐧𝐧 𝐂𝐚𝐬𝐢𝐧𝐨 𝐀𝐥 𝐌𝐚𝐫𝐣𝐚𝐧 𝐈𝐬𝐥𝐚𝐧𝐝 𝐑𝐀𝐊
Wynn Al Marjan Island is scheduled to open in 𝐒𝐞𝐩𝐭𝐞𝐦𝐛𝐞𝐫 𝟐𝟎𝟐𝟕, with its 70-story main hotel tower already topped out at 305 meters.
• 𝐓𝐨𝐰𝐞𝐫 𝐇𝐞𝐢𝐠𝐡𝐭:The 70-story main tower reached its full structural height of 305 meters in late 2025, making it the tallest building structure in RAK.
• 𝐖𝐨𝐫𝐤𝐟𝐨𝐫𝐜𝐞: More than 22,000 engineering, technical, and construction professionals are currently active on site.
• 𝐅𝐚ç𝐚𝐝𝐞 & 𝐆𝐥𝐚𝐬𝐬: Exterior curtain wall and reflective glass panel installation is past 83% completion.
• 𝐈𝐧𝐭𝐞𝐫𝐢𝐨𝐫 𝐅𝐢𝐭-𝐎𝐮𝐭: MEP (mechanical, electrical, and plumbing) installations and interior finishes are underway across the resort's 1,530 keys, including luxury rooms, Enclave suites, and the top-floor Royal Apartments.
• 𝐁𝐞𝐚𝐜𝐡𝐟𝐫𝐨𝐧𝐭 & 𝐋𝐚𝐠𝐨𝐨𝐧: A 550-meter private shoreline, sheltered lagoon, and offshore engineered reef have been finished, allowing marine life and coral to begin establishing.
• 𝐀𝐦𝐞𝐧𝐢𝐭𝐢𝐞𝐬 & 𝐈𝐧𝐟𝐫𝐚𝐬𝐭𝐫𝐮𝐜𝐭𝐮𝐫𝐞: Concrete frames for the 22 dining venues, retail arcades, the theater, 12 pools, and the Wynn Al Marjan Island Beach Club are largely complete.
• 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐂𝐨𝐬𝐭 & 𝐓𝐢𝐦𝐞𝐥𝐢𝐧𝐞: Total project costs have climbed to approximately $5.7 billion due to global shipping and material adjustments, pushing the target debut to September 2027.
𝘞𝘰𝘶𝘭𝘥 𝘺𝘰𝘶 𝘭𝘪𝘬𝘦 𝘪𝘯𝘧𝘰𝘳𝘮𝘢𝘵𝘪𝘰𝘯 𝘰𝘯 𝘳𝘦𝘢𝘭 𝘦𝘴𝘵𝘢𝘵𝘦 𝘪𝘯𝘷𝘦𝘴𝘵𝘮𝘦𝘯𝘵 𝘵𝘳𝘦𝘯𝘥𝘴 𝘢𝘳𝘰𝘶𝘯𝘥 𝘈𝘭 𝘔𝘢𝘳𝘫𝘢𝘯 𝘐𝘴𝘭𝘢𝘯𝘥 𝘰𝘳 𝘶𝘱𝘥𝘢𝘵𝘦𝘴 𝘰𝘯 𝘵𝘪𝘤𝘬𝘦𝘵-𝘣𝘰𝘰𝘬𝘪𝘯𝘨 𝘢𝘷𝘢𝘪𝘭𝘢𝘣𝘪𝘭𝘪𝘵𝘺 𝘢𝘴 𝘵𝘩𝘦 2027 𝘰𝘱𝘦𝘯𝘪𝘯𝘨 𝘢𝘱𝘱𝘳𝘰𝘢𝘤𝘩𝘦𝘴?