30/10/2026
This bathroom was reduced in size and the space gained knocked through to form a larger kitchen.
A lot of work went in to this older Paignton property with a concrete floor to overcome to run new pipework and remove old, dated but live cabling everywhere, artex ceilings to overboard and skim, walls battened and boarded in order for the shower tray to fit nicely, walls knocked down and disposed of off site along with a mountain of cardboard and other building waste, walls clad in solid floor to ceiling shower panels, new lighting installed and much more.
We’re really pleased with the end result.